One pair of beam bridge type hoists operational procedures---three

One pair of beam bridge type hoists operational procedures---three

2.34.After 3 works

a. Rise cliver to will certainly highly, cart stop in appointed position, controller Electronic Manufacturing| Electronic Manufacturing Services| China Electronic Manufacturer| Electronics Manufacturer| Electronics Manufacturing China| handle put to " zero " Location; Leave behind in one one hundred sheets of floodgates, cut off the power.

b. Maintain regular maintenance.

c. Do the work of relieving well.

2.35 Longmen / half an gantry operational procedure

2.35.Before 1 works

a. The operator carries on the inspection to parts such as the brake, China Electronics Manufacturers| Smt Electronic Manufacturing| Electronics Contract Manufacturing| Electronic Contract Manufacturing Services| Subcontract Pcb Assemblycliver, steel wire rope and safety device,etc. according to the requirement for handing over the card item by item, find the unusual situation, should get rid of.

b. Unclamp the rail inserting device.

2.35.In 2 work

a. Per tour at the first lifting heavy object '  When or load reaches the greatest weight)  ,Should be hanging overhead height 0. After the 5, put down heavy object again, in order to check brake performance, after confirm reliable, and then carry on the normal homework.

b. The operator should ring the bell to call the police to the following homework according to the regulation in the homework.

 One promotes, lands the heavy object; While starting the big, car and going.

 When the sight is not clear, the hoist exercises, passes, should ring the bell and call the police continuously;

 When the hoist goes and is close to another hoist while stepping;

 While hanging and transporting the heavy object and is close to personnel.

c. Operation should go on while operating according to the command signal stipulated in unison.

d. While cutting out in the work suddenly, should put all controllers handles in " zero " The location, should check whether hoists movements are normally before working again.

e. Hoist Longmen shelf, jack-up car forbid driving and applying the brake and parking against the car in the normal and lifting course; Vary big, when the car movement direction, must put the handle in " zero " The location, after making the organization totally stop operating, can drive backward.

f. There are the hoists of two clivers, when main fact, one pair of hooks change to take and two hooks are highly close, main fact, packs of hook must alone homework, in case that two hooks collide.

g.  The hoists of two clivers no two things hang at the same time in two check marks; The cliver not working must rise to and is close to the height of terminal position, is forbidden to hang the steel wire rope on the cliver.

h. Forbid the position limiter of limit of utilization to park, forbid adjusting and promoting the organization brake on condition that having load.

i. Carry out strictly "  Ten is not hung "  System:

 The command signal commands and does not hang unidentifiedly and arbitrarily;

 Exceed amount hang at the weight of blowing;

 It is unreasonable that the hoist is used or the things are tied and can not hang too firm to hang;

 Hang thing someone or have, float, put article hang while being other;

 Drive a vehicle and perch up the heavy object and does not hang while processing directly;

 Draw aslantly and hang and does not hang obliquly;

 There are explosive things that are not hung;  Bury in put things pull out, hang;  Take lump a mouthful of Module Manufacturer| Super Talent| MP3 Player| Flash Drive| Flash Card| OEM Module| things of raised angle, not pad very hanging;

 The cadre gives directions against regulations without hanging;

j. The operator should pay close attention to operation direction and nearby there is nobody or barrier.

k. Open-air dragon gantry of homework, should live plane anchor among them definitely after finishing in work. When greater than force by force 6 in wind-forcing, should generally quit work, and lock the machine rail pincers by inserting among them.

2.35.After 3 works

a. Rise cliver to will certainly highly, cart stop in appointed position, controller handle put to " zero " Location; Leave behind and protect one oneOEM Divison| Memory Module| Memory Card| USB Drive| SUB Contracting| DRAM module| Micro SD hundred sheets of switches handle of case, cut off the power, clamp and insert the rail or machine windproof anchor among them to lock.

b. Maintain regular maintenance.

c.  Do the work of relieving well. 

14:57 , 29.7.2008
اضافة تعليق

tovwscjjr

8fm6ap <a href="http://kjwyopgbajwp.com/">kjwyopgbajwp</a>, [url=http://pasxmpwbuzic.com/]pasxmpwbuzic[/url], [link=http://cjtwzolqyycq.com/]cjtwzolqyycq[/link], http://ilpjarvfqkrg.com/

tovwscjjr 17:50 , 26.10.2008

رابط


الصفحة الأخيرة | صفحة 2 من 4 | الصفحة التالبة