One pair of beam bridge type hoists operational procedures---two

One pair of beam bridge type Hydraulic pumps hoists operational procedures---two

g. Carry out strictly "  Ten is not hung "  System:

 The command signal commands and does not hang unidentifiedly and arbitrarily;

 Exceed amount hang at the weight of blowing;

 It is unreasonable that the hoist is used or the things are tied  and can not hang too firm to hang;

 Hang thing someone or have, float, put article hang while being Hydraulic motors--->hydraulics parts other;

 The safety device is not hung without working to embrace the floodgate or other and apply the brake;

 Drive a vehicle and perch up the heavy object and does not hang while processing directly;

 Draw aslantly and hang and does not hang obliquly;

 There are explosive things that are not hung;

 Bury in put things pull out, hang;

 Take lump a mouthful of things of raised angle, not pad  HTML clipboardUnique Handcrafted Jewelry| Heart Necklacevery hanging;

h. If find abnormality, shut down immediately, check the reason and get rid of in time.

2.33.After 3 works

a. Rise cliver to will certainly highly, the cart, car stop in the appointed position, controller handle put on "  Zero " Location; Leave behind and protect the case switch handle, cut off the power.

b. Maintain regular maintenance.

c.  Do the work of relieving well.

2.34 form beam bridge type hoists operational procedures

2.34.Before 1 works

a. The single beam bridge type hoist, driver with driver's cabin before carrying on,  HTML clipboardHandmade Jewelry| Beaded Necklaces| Hair Brushstarting, should go on, check according to the requirement for handing over the card item by item parts such as the cliver, steel wire rope and safety device,etc., find the unusual situation, should get rid of.

b. Single beam bridge hoist that ground handle, per tour should have special messenger responsible for, check according to requirement to hand over item by item the card, find the unusual situation, should get rid of.

c. The operator can close the main power source while confirming nobody on the platform or track of walking. Can close the main power source after removing by original relevant people while adding and locking or having signs at the power circuit breaker.

2.34.In 2 work

a. Per tour at the first lifting heavy object '  When or load reaches the greatest weight)  ,Should be hanging overhead height 0. After 5 meters, put down the heavy object again, check the brake performance, after it is reliable that confirm, and then carry on the normal homework.

b. Carry out strictly "  Ten is not hung "  System:

 The command signal commands and does not hang unidentifiedly and arbitrarily;

 Exceed amount hang at the weight of blowing;

 It is unreasonable that the hoist is used or the things are tied and can not HTML clipboardLeather Handbag |Pet Carrier| Leather handbags hang too firm to hang;

 Hang thing someone or have, float, put article hang while being other;

 The safety device is not hung without working to embrace the floodgate or other and apply the brake;

 Drive a vehicle and perch up the heavy object and does not hang while processing directly;

 Draw aslantly and hang and does not hang obliquly;

 There are explosive things that are not hung;

 Bury in put things pull out, hang;

 Take lump a mouthful of things of raised angle, not pad very hanging;

c. Find abnormality, shut down immediately, Hydraulics Parts---->Kato genuine cranes parts cut off the power, check the reason and get rid of in time.